Train Depot at Camp Courageous gets new work-pit

(L) Jay Iben and (R-Kneeling) James Kurth work away on a “pit” for the train’s depot. As a result of this 6’X6’X6′ deep pit, Train Engineer, Gerry Rohr is able to work under the train and cars. Before this, the train would be hoisted to work under it, which was always an unnecessary risk. The pit is a great addition to the train depot.